Sant Andreu Salou

1.25 Mw 13 plants of 90kwn, 2 of 30kwn and 2 of 10kwn (+ or – 7000 plates, the plates were 180) According to cadastral references, parcel_la 26 occupies a total area of 5.0325 Ha. The start-up was in September 2008

Riudarenes 2

1.9 Mw 21 plants of 90 kwn and 1 of 10 kwn (+ or – 12600 plates in total). The solar park will partially occupy the plot in an area of 5.12 Ha. The start-up was in April 2008.

Riudarenes 1

1 Mw (+ or – 6000 panels in total, at that time the panels were 170) 10 Photovoltaic plants of 102 kW that are part of a photovoltaic solar park. According to cadastral references, the plot occupies a total area of 8.56 Ha. The start-up was in March 2007.

Ordis

0.92 Mw 10 plants of 90kwn and 2 of 10kwn (+ or – 5400 plates in total) According to cadastral references, parcels 2 and 41 occupy a total area of 2.7436 Ha. The commissioning was in July 2008.

Garrigàs

1 Mw 11 plants of 90 kwn (+ or – 5800 plates) According to cadastral references, plot 63 and 64 occupy a total area of 3.0770 Ha. The start-up was in July 2008.